[{"data":1,"prerenderedAt":346},["ShallowReactive",2],{"blog-localized-en-roadmap-everyone-wants-waze-but-not-the-traffic-jam-or-the-detour":3,"localized-route-switch-blog-translations-roadmap-everyone-wants-waze-but-not-the-traffic-jam-or-the-detour":341,"blog-fallback-fr-roadmap-everyone-wants-waze-but-not-the-traffic-jam-or-the-detour":6,"article-link-preview-en-small-steps-big-vision-agility-continues-the-industrial-practices":342},{"id":4,"title":5,"attachment":6,"author":7,"body":8,"date":324,"description":325,"extension":326,"highlights":327,"image":331,"locale":332,"meta":333,"navigation":334,"path":335,"published":334,"seo":336,"showTranslationWarning":334,"slug":337,"stem":338,"tags":6,"translationKey":339,"__hash__":340},"blog\u002Fblog\u002Fen\u002F8-roadmap-everyone-wants-waze.md","Roadmaps: everyone wants Waze, but not the traffic jam or the detour",null,"Bastien",{"type":9,"value":10,"toc":314},"minimark",[11,15,18,21,24,29,32,35,44,48,51,64,67,70,73,76,79,83,86,89,92,95,98,102,105,108,111,116,119,127,130,134,137,140,144,147,158,161,183,186,189,193,196,199],[12,13,14],"p",{},"With my approximate English, if I had to translate \"road map\", I would say \"carte routière\": a map with all its possible roads and the choices to make as we move along the way. Merriam-Webster says nothing different about the literal meaning¹.",[12,16,17],{},"Yet in French, we translate it as \"feuille de route\"², literally marching orders: an order of movement that defines the options in advance. This slippage shows up in what the sponsors of our products and our stakeholders expect, too. Well, let's be honest: Merriam-Webster also knows the figurative meaning of \"plan\".",[12,19,20],{},"\"It's on our roadmap\" translates to \"it's planned after the other 150 priority features\"... \"Give us your roadmap\" translates to \"What commitment have you made for the years to come?\"... Phrases that close the debate instead of opening it.",[12,22,23],{},"My thesis: a roadmap is a map with hypotheses and options, not a guaranteed itinerary. It commits you only to the short term, proposing a long-term route that can change if the traffic changes.",[25,26,28],"h2",{"id":27},"a-roadmap-is-a-map","A roadmap is a map",[12,30,31],{},"Concretely, this map has three zones: options we commit to in the short term; then options that get blurrier the further we look, because they depend on conditions we have just met or are about to meet; and finally an ambition, an intention.",[12,33,34],{},"Agility, by the way, never rejected this kind of forecasting. As Fabien Billiet Vandeschrick reminded us on October 21st³, Mike Cohn's planning onion⁴ has been saying it since 2005: you plan at several horizons, with less and less detail the further you look. Revising the roadmap isn't going back on your word, it's exactly what it's made for: propose a route, see the wall coming and, to avoid it, correct as early as possible a trajectory that isn't the right one.",[12,36,37,38,43],{},"This brings me back to my article ",[39,40,42],"article-link",{"href":41},"\u002Fen\u002Fblog\u002Fsmall-steps-big-vision-agility-continues-the-industrial-practices","\"Small steps, big vision\"",": a stable vision, and a path that advances in small steps, which lets you change it if an obstacle rises in front of us. Of course, the length of the step depends on the market: an industrial player's small step would be a giant leap for the software developer who wanted to keep its length.",[25,45,47],{"id":46},"yet-everyone-needs-to-see-far-ahead","Yet everyone needs to see far ahead",[12,49,50],{},"When an organization talks about a roadmap, I often get the impression that what it hears is:",[52,53,54,58,61],"ul",{},[55,56,57],"li",{},"what fixed budget should we commit for the year? for three years?",[55,59,60],{},"what is the exhaustive list of new features we are going to get?",[55,62,63],{},"when exactly will they be delivered?",[12,65,66],{},"Behind these questions are perfectly legitimate needs: budgeting, coordinating, keeping commitments to customers.",[12,68,69],{},"And the product team needs it too: seeing a future beyond three months is motivating. It is even often the team that asks for it. Collective planning moments are among the most motivating, as I wrote in a post in 2025⁵.",[12,71,72],{},"Deep down, sponsors want Waze at the moment the trip starts: a defined route and an arrival time. That's understandable.",[12,74,75],{},"And let's be honest: we agilists have probably fed their distrust, by refusing any roadmap or any estimate on principle, without taking the context into account.",[12,77,78],{},"If the need to see far is legitimate, the real question becomes: what status should we give to that future?",[25,80,82],{"id":81},"three-months-on-track-then-the-crash","Three months on track, then the crash",[12,84,85],{},"And here is the drama, because this status is regularly a source of conflict: an honest proposal for the team, a firm commitment for the stakeholders.",[12,87,88],{},"A real example. After some fairly successful planning sessions, my team had to re-estimate a large remaining backlog. It proposed splitting it into three scopes, to deliver value to users quickly.",[12,90,91],{},"The planning workshop estimated each of them, and the result was projected onto a fairly long roadmap: with the knowledge of the time, a first scope in 3 months, the second in 6, the third in 9. This plan was taken as a commitment by the stakeholders, with no margin for the unknown.",[12,93,94],{},"The first milestone was met, but at the cost of an effort far heavier than planned: it was the first deployment, and the next stretch started late. To meet the second milestone \"somehow or other\", we sacrificed features and discovery. The result: users rejected it, we had to go back to discovery, and the deployment was pushed back by 6 months.",[12,96,97],{},"It wasn't the planning that failed, it was the status given to its result.",[25,99,101],{"id":100},"the-price-of-predictability","The price of predictability",[12,103,104],{},"Here we enter a vicious circle: to keep a \"promise\", discovery, and therefore the means of correcting our hypotheses, is sacrificed. The next milestone then rests on even more unverified hypotheses.",[12,106,107],{},"As early as 1976, Barry Staw described this mechanism, the escalation of commitment: the more you have committed to a decision that is going badly, the more you reinvest to save it⁶.",[12,109,110],{},"And that's not all: in our products, at the start, the destination is blurry. \"By the sea\", then \"between sea and mountains\" (and even with that precision, there are still two diametrically opposed options in the South of France). The chain intention → discovery → need → solution → features therefore has to get going to refine the route: it is impossible to have a precise route to a destination that hasn't been chosen yet.",[112,113],"centered-image",{"alt":114,"image":115},"From intention to features: what each horizon can carry","\u002Fimages\u002Fblog\u002F8\u002Fchain-intention-features.png",[12,117,118],{},"And the further we go, the less precise the arrival time. Waze doesn't count:",[52,120,121,124],{},[55,122,123],{},"the breaks (in our contexts: support, absences, meetings). We account for them by not planning 100% of capacity, but it remains very random;",[55,125,126],{},"the accidents, unpredictable, which completely block an option.",[12,128,129],{},"The precision of an estimate can only improve as discovery allows decisions to be made. This is what the cone of uncertainty illustrates, described by Barry Boehm and popularized by Steve McConnell⁷.",[112,131],{"alt":132,"image":133},"The further you look, the blurrier the estimate: the cone of uncertainty","\u002Fimages\u002Fblog\u002F8\u002Fcone-of-uncertainty.png",[12,135,136],{},"Waze without traffic jams or recalculation is a train timetable. And not just any one: the Shinkansen and its average delay of 1.6 minutes⁸. But Japanese punctuality has to be bought: a massive investment in dedicated tracks to remove variability⁹, and nobody waits for latecomers on the platform.",[12,138,139],{},"And let's remember that, in classic project management, a one-year forecast is paid for by a long specification phase. And even paid for, it remains approximate.",[25,141,143],{"id":142},"separate-what-motivates-from-what-commits","Separate what motivates from what commits",[12,145,146],{},"Bjarte Bogsnes identified the same problem in corporate budgeting¹⁰. For him, the traditional budget doesn't fail because of what it tries to do, but because it tries to do three different things with a single process and a single set of numbers:",[52,148,149,152,155],{},[55,150,151],{},"the target: what we want;",[55,153,154],{},"the forecast: what we think is going to happen;",[55,156,157],{},"the allocation: where we put the effort.",[12,159,160],{},"The frozen roadmap makes exactly the same confusion. Bogsnes proposes separating these three purposes, and three simple practices let us do it:",[162,163,164,171,177],"ol",{},[55,165,166,170],{},[167,168,169],"strong",{},"Show the status of each horizon",": committed (the quarter), forecast (as a range), intention (beyond). We separate what we want from what we forecast; these are the three zones of the map.",[55,172,173,176],{},[167,174,175],{},"Plan for the breaks",": an explicit margin for the unknown. That is the role of SAFe's \"uncommitted\" objectives, planned within capacity but excluded from the commitment¹¹.",[55,178,179,182],{},[167,180,181],{},"Recalculate after the accident",": revise the roadmap on a fixed date, every quarter, as a ritual and not as an admission of failure. Bogsnes talks about rolling forecasts.",[12,184,185],{},"That leaves the allocation. For my part, I try to offer the \"Buy the Future\" workshop: identifying medium- and long-term investment intentions, without buying specific features. The question put to stakeholders: what benefit do you want to achieve, and what investment are you ready to put into it? The discussion then focuses on the fit between benefit and investment. It's Bogsnes's allocation in product form, very close to Spotify's \"bets\"¹².",[12,187,188],{},"A small anecdote: this idea obviously comes from \"Buy a Feature\"¹³, one of the first workshops of the Club Agile Rhône-Alpes I took part in, in 2016, run by Grégory Alexandre and Alfred Almendra. I haven't yet been able to run my version, but I intend to offer it again very soon, and I'll tell you how it goes.",[25,190,192],{"id":191},"conclusion","Conclusion",[12,194,195],{},"Put away your train timetable and pull out the map again, the old-fashioned way. A frozen roadmap won't take you to your destination peacefully. A map, with its hypotheses and its options, lets you recalculate, and sometimes discover along the way a better destination than the one you imagined.",[12,197,198],{},"And at your place, what status does the roadmap have?",[200,201,203,212,219,226,234,241,248,263,270,277,288,295,307],"collapsible",{"title":202},"Notes",[12,204,205,206],{},"¹ Merriam-Webster, \"road map\", ",[207,208,209],"a",{"href":209,"rel":210},"https:\u002F\u002Fwww.merriam-webster.com\u002Fdictionary\u002Froad%20map",[211],"nofollow",[12,213,214,215],{},"² Dictionnaire de l'Académie française, 9th edition, entry \"route\" (in French): ",[207,216,217],{"href":217,"rel":218},"https:\u002F\u002Fdictionnaire-academie.fr\u002Farticle\u002FA9R3120",[211],[12,220,221,222],{},"³ Fabien Billiet Vandeschrick, LinkedIn post of October 21, 2026 (in French): ",[207,223,224],{"href":224,"rel":225},"https:\u002F\u002Flnkd.in\u002Fp\u002Feh96vMHe",[211],[12,227,228,229,233],{},"⁴ Mike Cohn, ",[230,231,232],"em",{},"Agile Estimating and Planning",", Prentice Hall, 2005.",[12,235,236,237],{},"⁵ Bastien Jacoud, LinkedIn post from 2025 on collective planning (in French): ",[207,238,239],{"href":239,"rel":240},"https:\u002F\u002Flnkd.in\u002Fp\u002FevS9vZbt",[211],[12,242,243,244,247],{},"⁶ Barry M. Staw, \"Knee-deep in the big muddy: A study of escalating commitment to a chosen course of action\", ",[230,245,246],{},"Organizational Behavior and Human Performance",", 16(1), 1976, p. 27-44.",[12,249,250,251,254,255,258,259],{},"⁷ Barry Boehm, ",[230,252,253],{},"Software Engineering Economics",", Prentice Hall, 1981; Steve McConnell, ",[230,256,257],{},"Software Estimation: Demystifying the Black Art",", Microsoft Press, 2006. See also Construx's white paper: ",[207,260,261],{"href":261,"rel":262},"https:\u002F\u002Fwww.construx.com\u002Fwp-content\u002Fuploads\u002F2019\u002F02\u002FCxWhitePaper_ConeOfUncertainty.pdf",[211],[12,264,265,266],{},"⁸ JR Central, \"About the Shinkansen\" (average delay per train in fiscal year 2023, natural disasters included): ",[207,267,268],{"href":268,"rel":269},"https:\u002F\u002Fglobal.jr-central.co.jp\u002Fen\u002Fcompany\u002Fabout_shinkansen",[211],[12,271,272,273],{},"⁹ High Speed Rail Alliance, \"The Shinkansen's legendary operation and safety record\", July 24, 2024: ",[207,274,275],{"href":275,"rel":276},"https:\u002F\u002Fwww.hsrail.org\u002F?p=14984",[211],[12,278,279,280,283,284],{},"¹⁰ Bjarte Bogsnes, interview by Elizabeth Harrin, ",[230,281,282],{},"A Girl's Guide to Project Management"," (Rebel's Guide to PM), November 11, 2013: ",[207,285,286],{"href":286,"rel":287},"https:\u002F\u002Frebelsguidetopm.com\u002Fbeyond-budgeting-an-interview-with-bjarte-bogsnes-part-1\u002F",[211],[12,289,290,291],{},"¹¹ Scaled Agile, \"PI Objectives\" (updated December 13, 2022): ",[207,292,293],{"href":293,"rel":294},"https:\u002F\u002Fscaledagileframework.com\u002Fpi-objectives",[211],[12,296,297,298,302,303],{},"¹² Henrik Kniberg, \"Spotify Rhythm – how we get aligned\", Crisp blog, June 8, 2016: ",[207,299,300],{"href":300,"rel":301},"https:\u002F\u002Fblog.crisp.se\u002F2016\u002F06\u002F08\u002Fhenrikkniberg\u002Fspotify-rhythm",[211],". See also MAA1, \"My Product Management Toolkit (56): Spotify's \"Bets Board\"\", Medium, 2023: ",[207,304,305],{"href":305,"rel":306},"https:\u002F\u002Fmaa1.medium.com\u002Fthinking-in-bets-starts-with-recognising-that-there-are-exactly-two-things-that-determine-how-our-5cbdfdc02adf",[211],[12,308,309,310,313],{},"¹³ Luke Hohmann, ",[230,311,312],{},"Innovation Games: Creating Breakthrough Products Through Collaborative Play",", Addison-Wesley, 2006.",{"title":315,"searchDepth":316,"depth":316,"links":317},"",2,[318,319,320,321,322,323],{"id":27,"depth":316,"text":28},{"id":46,"depth":316,"text":47},{"id":81,"depth":316,"text":82},{"id":100,"depth":316,"text":101},{"id":142,"depth":316,"text":143},{"id":191,"depth":316,"text":192},"2026-11-08","A roadmap is a map, not marching orders: it commits you to the short term and is recalculated along the way. Why freezing it costs so much, and how to stop.","md",[328,329,330],"A roadmap is a map, not marching orders. It commits you to the short term and offers a route for what comes next, one you recalculate when the traffic changes.","Keeping the promise at all costs is expensive. Three months on track, then discovery sacrificed to hit the next milestone: users rejected it, and we lost six months.","Separate what you want, what you forecast and where you put the effort. Show the status of each horizon, keep a buffer for the unknown, and revise every quarter.","8-roadmap-everyone-wants-waze.jpeg","en",{},true,"\u002Fblog\u002Fen\u002F8-roadmap-everyone-wants-waze",{"title":5,"description":325},"roadmap-everyone-wants-waze-but-not-the-traffic-jam-or-the-detour","blog\u002Fen\u002F8-roadmap-everyone-wants-waze","roadmap-tout-le-monde-veut-waze","GBaaJC8ITyR3dPmMd0ujJIBRfDxi9D_q3zMRBEcb94U",{"en":337,"fr":339},{"title":343,"description":344,"image":345},"Small steps, big vision: why industrial leaders never aim for the best product on the first try","Dassault, Intel, Airbus, Boeing: industrial leaders have always bet on small, deliberate steps — and it turns out agility is simply the continuation of that same discipline.","5-la-politique-des-petits-pas-chez-dassault.png",1794164902913]